Mandate for delegated project management for the implementation of the infrastructure modernization program of the ASA du canal de Peyrolles

COUNTRY / PLACE
France

 / Provence-Alpes-Côte d'Azur

CLIENT
ASA du Canal de Peyrolles

START DATE :

October 2025

END DATE :

December 2029

Project description

To improve the performance of its irrigation system and sustainably preserve water resources, the ASA of the Peyrolles Canal has launched a large-scale program to modernize its infrastructure. The SCP is responsible for delegated project management and financial oversight of this €4.675 million operation, covering 300 hectares of agricultural land. 

The project involves transforming the historic gravity irrigation networks into more efficient and water-saving equipment. The developments include creating or adapting pumping stations, redesigning the intakes on the main canal, and installing pressurized and low-pressure pipe networks. 

The old open-air canals supplying farmland are gradually being replaced by modern infrastructure that allows for more reliable, efficient, and better-adapted water distribution for current agricultural practices. 

This modernization aims to reduce water loss, improve operational comfort for irrigators, and strengthen the sustainability of the irrigation system. It also helps secure the water supply for farms in the face of growing challenges in resource management and climate change adaptation.  

Services provided by SCP: