Turnkey project for hydraulic infrastructure – SOSUCAM

Pays / Lieu Cameroon
Client SOSUCAM, Mbandjock
Date de démarrage: March 2017
Date de fin: June 2018

Project description

Turnkey project for irrigation of 1,000 ha of rain-fed sugar-cane plantations (detailed works design, implementation of works, running-in, assistance with commissioning, delivery of all equipment). 

The project consists of a river intake, a 17-km hydraulic network, and a dozen 80-hectare irrigation pivots.