Feasibility study for the construction of irrigation infrastructure, Morocco

Project description This project aims to conduct feasibility studies with a view to setting up a public-private partnership. It encompasses all stages of the process leading to the signing of the partnership contract for the construction of a 30,000-ha irrigation infrastructure in the Saïss plain. This infrastructure will safeguard local agriculture whilst at the same […]

Creation of a partnership between the SAED and Northern regional development company

Project description The Regional Development Companies involved in this partnership provides technical support, expertise, consulting, and training for the benefit of the SAED (The National Organisation for Development and Operation of the Delta Region). Support to the SAED covers the following areas: management of public investments in rural development projects, sustainable and shared-cost maintenance of […]

Refurbishment of the Bimont dam and associated infrastructure

Project description The Bimont dam is a Class-A structure measuring 87 m in height and 180 m in length at its crest. It serves to secure the water supply for several communities in the Aix-en-Provence region, as well as for the irrigation of 8,000 hectares. It supplies the Arc Valley industrial area, and satisfies 30% […]

Establishment of the 2015 -2019 strategic plan for the Volta Basin Authority (VBA)

Project description This project set out to establish a new five-year plan for the VBA (Volta Basin Authority). This consisted of drawing up new strategic guidelines which gave rise to an action plan intended to strengthen the VBA’s role as a transboundary authority. The action plan included various institutional and technical initiatives, as well as […]

Feasibility study for an irrigation network – SOSUCAM

Project description Turnkey project for irrigation of 1,000 ha of rain-fed sugar-cane plantations (detailed works design, implementation of works, running-in, assistance with commissioning, delivery of all equipment). The project consists of a river intake, a 17-km hydraulic network, and a dozen 80-hectare irrigation pivots. Services provided: Full management and supervision of the project for a […]

Reinforcing and securing the Bras de la Plaine water catchment

Project description Since its commissioning in 1971, this dam – 36.6m wide and 7m high overflow – has suffered considerable damage and successive reinforcement works have been carried out. In spite of these costly works, which faced particularly challenging access conditions, both the dam and counter-dam remained in very poor condition.  Following a comprehensive analysis […]

Rehabilitation and modernisation of the Avezac irrigation scheme

Launch of study Total value of contract: €4,200,000 Names and functions of SCP participants: Sébastien CAUCHY: Water Engineer and Project Manager Yann FLORIANSICS: Civil Engineer Sylvain SAUVIAT: Agriculture & Irrigation Engineer Magali VERGNET: Project Support Completion of study Value of services provided by SCP: €337,375 Names of associated consultants / partners (if applicable): Génie Conseil […]

Votre avis nous intéresse !

Afin de nous aider à améliorer notre site internet.

Votre avis nous intéresse !

Afin de nous aider à améliorer notre site internet.