Management of safety works on the Dardennes dam

Project description The Dardennes dam is located a few kilometers north of Toulon, near the village of Revest Les Eaux. The project consists of: Risk assessment Flood wave modelling as far as Toulon in the event of dam failure Diagnosis and preliminary studies Performing and following up geotechnical reconnaissance missions Creation of a physical model […]
Refurbishment of the Saint-Denis river water catchment for compliance

Project description This strategically located water catchment is made up of a weir and an outlet pond which feeds a gallery cut into the rock. The water then flows by gravity to the Bellepierre treatment plant, which delivers 48% of the drinking water supply for the city of Saint Denis. Consequently, this project is of […]
Renovation of the Bimont dam and associated structures

Project description The Bimont Dam (Class A – Height: 87 m – Crest length: 180 m) serves as a safety reservoir for supplying water to several municipalities in the Aix region and for irrigating 8,000 hectares. It supplies the industrial zone of the Arc Valley, provides 30% of the water needs of the Aix region […]
Reinforcing and securing the Bras de la Plaine water catchment

Project description Since its commissioning in 1971, the structure (36.6 m spillway – 7 m drop height) has suffered numerous damages and has undergone multiple reinforcement works. Despite these costly works, carried out under particularly difficult conditions, the dam and the counter-dam were in a severely degraded state. Following a comprehensive diagnosis by SCP demonstrating […]